Unique capabilities for the Floor Covering Industry

OMP Plus features a number of unique capabilities for managing and optimizing specific constraints of the Floor covering industry on various planning levels:

Strategic design: covers Network Design, Product Portfolio Optimization and Inventory Optimization.
Network Design is used to decide on location and capacity investments and disinvestments.
Product Portfolio Optimization identifies the profitability of existing and new product lines and manages SKU proliferation.
Inventory Optimization determines manufacturing and distribution inventory levels linked with capacity flexibility requirements. Additional optimization is performed for default WIP and finished goods product dimensions for rolled goods.

Sales and Operations Planning: optimizes constrained sales plans, capacity utilization and long term component requirements. Demand is allocated to resources and the operational margin is maximized.

Forecasting: manages and generates multi-level sales and replenishment forecasts for core products and accessories. Forecasts are generated for make-to-order products at consolidated level and make-to-stock products at SKU-level.

Master planning: creates inventory deployment plans linking make-to-order demand with capacity reservations. It also generates finite capacity plans and campaign planning.
Purchase plans and production programs are calculated for all production steps, respecting due dates, maximizing bottleneck throughput and minimizing total factory WIP. These plans can be calculated respecting lot allocation and tracking.

Scheduling: synchronizes production steps across all manufacturing processes including transportation. We sequence production steps respecting due dates, minimizing set-ups and WIP, and maximizing throughput. A feedback of actual production is incorporated to update the schedule at all times.

Order Management: allocates orders to forecasts/reservations and generates reliable promise dates in a mixed make-to-order and make-to-stock environment. Promise dates are calculated based on capacity availability and current and future material lot availability.

Learn more about OMP Plus